Skip to the main content
Cooperative · Alaska

Chugach Electric Association and your EV charger

Chugach Electric Association offers 1 electric vehicle (EV) program in Alaska that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

Chugach Electric Association EV programs in Alaska: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Chugach Residential EV Charging ProgramEV programResidential$200Open2026-09-08chugachelectric.com

Verified programs

Chugach Residential EV Charging Program$200

Capped at $400.

Open
Who qualifies · 3 conditions
  • Chugach Electric Association residential member
  • Level 2 charger or 240V receptacle with mobile L2 connector installed at home
  • Proof of EV charging required
VerifiedLast checked 2026-09-08chugachelectric.com

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Level 2 Charging Station Purchase Rebate
  • EV Direct Current (DC) Fast Charging Station Purchase Rebate
  • EV Level 2 Charging Station Installation Rebate
  • EV Direct Current (DC) Fast Charging Station Installation Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Chugach Electric Association's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.chugachelectric.com/energy-solutions/electric-vehicles


Price the install for your address

Whatever Chugach Electric Association does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.