Sawnee Electric Membership Corporation and your EV charger

Sawnee Electric Membership Corporation offers 2 electric vehicle (EV) programs in Georgia that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

Sawnee Electric Membership Corporation EV programs in Georgia: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Level 2 Charger RebateEV charger rebateResidential$200Open2026-08-25sawnee.coop
Level 3 / DC Fast Charger Contribution-in-Aid-of-Construction (CIAC) ReductionEV programCommercial20% of cost, up to $2,000Status not confirmed2026-08-25sawnee.coop

Verified programs

Level 2 Charger Rebate$200
Open
Who qualifies · 7 conditions
  • Account billed under Residential Time of Use (TU), Critical Peak Pricing (CPPR), or Plug-in Electric Vehicle (PEV) rate schedule — a rate change is required if not already enrolled
  • Vehicle using the charger must be fully electric; plug-in hybrids do NOT qualify
  • New 240V Level 2 charger, 40+ amps output, UL or ETL listed
  • Portable and secondhand chargers are ineligible
  • Installation must occur within the present calendar year
  • Must remain on the selected rate schedule for 12 consecutive months or the $200 is recalled plus a rate adjustment/fee
  • Sawnee representative performs a visual site verification of the installation
VerifiedLast checked 2026-08-25sawnee.coop
Level 3 / DC Fast Charger Contribution-in-Aid-of-Construction (CIAC) Reduction20%of cost, up to $2,000
Status not confirmed
Who qualifies · 2 conditions
  • Non-residential (commercial) Sawnee EMC member installing a Level 3/DC fast charger
  • Discount applies against the member's own Contribution in Aid to Construction charge for the service extension/upgrade
VerifiedLast checked 2026-08-25sawnee.coop

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate
  • EV Level 2 Charging Station Installation Rebate
  • Make-Ready or Pre-Wiring Rebate for EV Chargers

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Sawnee Electric Membership Corporation's own published terms.

Questions about Sawnee Electric Membership Corporation in Georgia

How much is the Sawnee Electric Membership Corporation EV charger rebate in Georgia?

For residential customers, Sawnee Electric Membership Corporation's Level 2 Charger Rebate in Georgia is $200 (Open, checked 2026-08-25).

Is the Sawnee Electric Membership Corporation EV charger rebate still available in Georgia?

Yes. Sawnee Electric Membership Corporation's Level 2 Charger Rebate in Georgia: Open, checked 2026-08-25 against Sawnee Electric Membership Corporation's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.sawnee.coop/


Price the install for your address

Whatever Sawnee Electric Membership Corporation does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.