Skip to the main content
Not stated · Iowa

MidAmerican Energy Company and your EV charger

MidAmerican Energy Company offers 1 electric vehicle (EV) program in Iowa that we have verified against its own published terms, listed below with the funding status and the date we checked. It does not set a flat dollar amount — the published terms give a rate or a conditional maximum instead — so we show no figure rather than invent one.

Federal listing checked 2026-08-25

MidAmerican Energy Company EV programs in Iowa: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Rate RST — Residential Time-of-Use Service (optional)EV programResidentialSee the sponsor's termsOpen2026-09-02midamericanenergy.com

Verified programs

Rate RST — Residential Time-of-Use Service (optional)
Open
Who qualifies · 4 conditions
  • Single-family dwelling, Residential Iowa Customer
  • Annual billed energy usage of 50,000 kWh or less
  • Optional / opt-in
  • Not EV-specific — general residential TOU rate MidAmerican markets to EV owners
VerifiedLast checked 2026-09-02midamericanenergy.com

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from MidAmerican Energy Company's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: http://www.midamericanenergy.com/


Price the install for your address

Whatever MidAmerican Energy Company does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.