Alpena Power Co and your EV charger
Alpena Power Co offers 1 electric vehicle (EV) program in Michigan that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.
Federal listing checked 2026-08-25
| Program | Type | Who qualifies | Amount | Status | Checked | Source |
|---|---|---|---|---|---|---|
| Residential Plug-In Electric Vehicle Service Rate (PEV) | EV program | Residential | $0.12349/kWh rate | Open | 2026-08-31 | alpenapower.com |
Verified programs
- Alpena Power Company residential customer with a plug-in EV
- Energy used by the charger must be metered separately with a time-of-use meter
Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.
Listed by the Department of Energy
- EV Time-of-Use (TOU) Rate
Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Alpena Power Co's own published terms.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.alpenapower.com/electric-vehicle-rates-programs-residential/
Price the install for your address
Whatever Alpena Power Co does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.