Skip to the main content
Investor-owned · Minnesota

Otter Tail Power and your EV charger

Otter Tail Power offers 1 electric vehicle (EV) program in Minnesota that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

Otter Tail Power EV programs in Minnesota: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Electric Vehicle Charging Station RebateEV charger rebateResidential$500Open2026-09-02otpco.com

Verified programs

Electric Vehicle Charging Station Rebate$500
Open
Who qualifies · 4 conditions
  • Otter Tail Power Company electric customer (new equipment installed where OTP supplies the electricity)
  • Hardwired Level 2 charger installed on a qualifying off-peak/controlled rate: Dual Fuel, Deferred Load, Fixed Time of Delivery, RDC, or the Minnesota-only EVantage Rate
  • Rebate request must be submitted no later than March 31 of the calendar year following installation
  • Proof of installation (dated sales receipt or itemized invoice) required; bids/quotes/purchase orders do not qualify
VerifiedLast checked 2026-09-02otpco.com

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate
  • EV Level 2 Charging Station Installation Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Otter Tail Power's own published terms.

Questions about Otter Tail Power in Minnesota

How much is the Otter Tail Power EV charger rebate in Minnesota?

For residential customers, Otter Tail Power's Electric Vehicle Charging Station Rebate in Minnesota is $500 (Open, checked 2026-09-02).

Is the Otter Tail Power EV charger rebate still available in Minnesota?

Yes. Otter Tail Power's Electric Vehicle Charging Station Rebate in Minnesota: Open, checked 2026-09-02 against Otter Tail Power's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.otpco.com/ways-to-save/topics/electric-vehicles/


Price the install for your address

Whatever Otter Tail Power does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.