Evergy and your EV charger
Evergy offers 3 electric vehicle (EV) programs in Missouri that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.
Federal listing checked 2026-08-25
| Program | Type | Who qualifies | Amount | Status | Checked | Source |
|---|---|---|---|---|---|---|
| Residential EV Charging Rebate | EV program | Residential | $500 | Open — limited funding, ends 2027-03-31 | 2026-09-02 | evergy.com |
| Developer EV Charging Rebate (new residential construction) | EV program | Residential | $250 | Open — limited funding, ends 2027-03-31 | 2026-09-02 | evergy.com |
| Business EV Charging Rebate | EV program | Commercial, multifamily, fleet, public sector | $2,500 per port | Open — limited funding, ends 2028-03-31 | 2026-09-02 | evergy.com |
Verified programs
- Evergy Missouri Metro or Evergy Missouri West residential customer, not in collections
- Own or lease an EV
- Enrolled in a residential Time-of-Use (TOU) rate; must remain on TOU for one year after receiving the rebate
- EV Outlet or Hardwired EV Charger installed by a certified electrician on or after 2022-04-01
- One rebate per qualifying residence
- Apply via evergy.com; rebate must be claimed within 6 months of installation
- Builders and developers (not homeowners) in Evergy Missouri Metro or Missouri West territory
- EV Outlet (dedicated 240V/40A+ circuit, e.g. NEMA 14-50) installed by a certified electrician in a NEW single-family, duplex, or fourplex residence
- Outlet must be labeled with an EV-charging-use sticker
- Not eligible where local code already mandates EV-ready wiring in new construction
- Apply via evergy.com
Capped at $65,000.
- Non-residential Evergy Missouri Metro or Missouri West customer on the Business EV Charging Service rate schedule, not in collections
- Preapproval by Evergy REQUIRED before project start date
- Site Host must own/operate/maintain EVSE for at least 5 years
- Equipment must be from Evergy's Qualified EVSE / Network Service Provider list
- Dedicated parking space per L2 port, one space per DCFC
Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.
Listed by the Department of Energy
- EV Time-of-Use (TOU) Rate
- EV Level 2 Charging Station Purchase Rebate
- EV Direct Current (DC) Fast Charging Station Purchase Rebate
Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Evergy's own published terms.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.evergy.com/ways-to-save/incentives-link/ev-charging-rebates/fleet-electrification
Price the install for your address
Whatever Evergy does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.