Skip to the main content
Cooperative · New Hampshire

New Hampshire Electric Co and your EV charger

New Hampshire Electric Co offers 1 electric vehicle (EV) program in New Hampshire that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

New Hampshire Electric Co EV programs in New Hampshire: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
NHEC Residential EV Charging Station RebateEV programResidential$300Open2026-09-08nhec.com

Verified programs

NHEC Residential EV Charging Station Rebate$300
Open
Who qualifies · 4 conditions
  • NHEC residential member
  • Level 2 home charging station
  • Must enroll in NHEC's off-peak EV charging rate program
  • Post-installation inspection required before rebate pays
VerifiedLast checked 2026-09-08nhec.com

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate
  • EV Level 2 Charging Station Installation Rebate
  • EV Direct Current (DC) Fast Charging Station Installation Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from New Hampshire Electric Co's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.nhec.com/energy-savings/

Other New Hampshire utilities

Price the install for your address

Whatever New Hampshire Electric Co does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.