Atlantic City Electric Company (ACE), an Exelon company and your EV charger

Atlantic City Electric Company (ACE), an Exelon company offers 1 EV program we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked null

Verified programs

Residential Make-Ready Rebate (ACE EVsmart Program)50%of cost, up to $1,000
Open — limited fundingends 2026-12-31
Who qualifies · 5 conditions
  • Atlantic City Electric residential customer
  • New EV charging equipment installed after February 17, 2021, by a licensed electrician
  • New qualified smart Level 2 charger, rated nameplate capacity at least 3.8kW, with a standard SAE J1772 connector
  • Customer must share EV charging data per program terms and conditions
  • Limit of one rebate per residential service address; 1,500-participant program-wide cap
VerifiedLast checked 2026-08-31

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Not in the federal directory

The Department of Energy’s Alternative Fuels Data Center does not carry a listing for Atlantic City Electric Company (ACE), an Exelon company. That is a gap in the federal directory rather than a statement about this utility — what appears above was read directly from the utility’s own published material.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.atlanticcityelectric.com/smart-energy/innovation-technology/residential-charger-rebate


Price the install for your address

Whatever Atlantic City Electric Company (ACE), an Exelon company does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.