AES Ohio (formerly Dayton Power & Light) and your EV charger
AES Ohio (formerly Dayton Power & Light) offers 2 EV programs we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.
Federal listing checked null
Verified programs
The amount is tiered — see the source for which tier applies.
- Chargers must be installed at workplaces, apartment complexes, or publicly-accessible locations -- NOT single-family residential
- All qualifying chargers must be able to record and send usage data to AES Ohio
- Pre-application required before installation; final rebate application with documentation required after
The amount is tiered — see the source for which tier applies.
- AES Ohio residential customer
- Must enroll an existing qualified Level 2 charger or EV in the program
- Device must appear on AES Ohio's Qualified Product List
- Off-peak charging window: 8:00 PM-8:00 AM
Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.
Not in the federal directory
The Department of Energy’s Alternative Fuels Data Center does not carry a listing for AES Ohio (formerly Dayton Power & Light). That is a gap in the federal directory rather than a statement about this utility — what appears above was read directly from the utility’s own published material.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.aes-ohio.com/sites/default/files/2022-04/EV-OH_Charger-Rebate-Marketing_Fact-Sheet-V2.pdf
Price the install for your address
Whatever AES Ohio (formerly Dayton Power & Light) does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.