Eugene Water & Electric Board (EWEB) and your EV charger
Eugene Water & Electric Board (EWEB) offers 3 electric vehicle (EV) programs in Oregon that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.
Federal listing checked 2026-08-25
| Program | Type | Who qualifies | Amount | Status | Checked | Source |
|---|---|---|---|---|---|---|
| Residential Level 2 EV Charger Rebate | EV charger rebate | Residential | $500 | Open | 2026-09-02 | eweb.org |
| Business/Public Level 2 EV Charger Rebate | EV program | Commercial, multifamily | $2,000–$3,500 per port | Open | 2026-08-25 | eweb.org |
| DC Fast Charger (DCFC) Installation Rebate | EV program | Commercial | $15,000–$25,000 per port | Open | 2026-08-25 | eweb.org |
Verified programs
- Applicant must have authority to direct and install the equipment
- Must be installed at a premises with a residential EWEB electric account
- EVSE must be Level 2 (240V) and listed under a Nationally Recognized Testing Laboratory (UL or ETL)
- Installation must be permitted, inspected, and approved per National Electric Code
- Limited to one rebate per residential electric account
- Application must be submitted within 120 days of installation
- Applicant must own the property or have authorization from the property owner
- Must receive written preapproval before installation
- Rebate cannot exceed 75% of eligible project costs
- Commercial-grade equipment required (residential units excluded)
- Must comply with National Electrical Code and local permitting
- Applicant must own the property or have authorization from the property owner
- Must receive written preapproval before installation
- Rebate cannot exceed 75% of eligible project costs
- Commercial-grade equipment required
- Must comply with National Electrical Code and local permitting
Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.
Also from Eugene Water & Electric Board (EWEB) — not part of your charger estimate
Each of these is money Eugene Water & Electric Board (EWEB) publishes with a condition attached, and the condition is the part that decides whether the figure is available to you at all. None of it is charger money. Nothing here is added to the amounts above, or to each other.
Loan ceiling; the $5,000 figure is a separate grant ceiling for limited-income applicants only, not additive to the loan.
Where it applies: $5,000–$20,000
- EWEB residential electric customer
- Homeowner must be the applicant with signature required
- Licensed, insured, bonded electrician mandatory; work must be permitted, inspected, and NEC-compliant
- Grant tier: household income under 200% of Federal Poverty Guidelines, and the home must be the applicant's primary residence
- At least two estimates required, reviewed by an EWEB project manager before authorization
Listed by the Department of Energy
- EV Level 2 Charging Station Installation Rebate
- EV Direct Current (DC) Fast Charging Station Installation Rebate
Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Eugene Water & Electric Board (EWEB)'s own published terms.
Questions about Eugene Water & Electric Board (EWEB) in Oregon
How much is the Eugene Water & Electric Board (EWEB) EV charger rebate in Oregon?
For residential customers, Eugene Water & Electric Board (EWEB)'s Residential Level 2 EV Charger Rebate in Oregon is $500 (Open, checked 2026-09-02).
Is the Eugene Water & Electric Board (EWEB) EV charger rebate still available in Oregon?
Yes. Eugene Water & Electric Board (EWEB)'s Residential Level 2 EV Charger Rebate in Oregon: Open, checked 2026-09-02 against Eugene Water & Electric Board (EWEB)'s own published terms.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.eweb.org/ev
Price the install for your address
Whatever Eugene Water & Electric Board (EWEB) does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.