Skip to the main content
Investor-owned · South Carolina

Duke Energy and your EV charger

Duke Energy offers 1 electric vehicle (EV) program in South Carolina that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

Duke Energy EV programs in South Carolina: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Electric Vehicle Make Ready Infrastructure Program MREV (SC), publicly branded 'Charger Prep Credit'Electrical work, toward the wiringResidential, commercial, multifamily, fleetup to $1,755 maximum for a residential L2 installationOpen2026-08-13etariff.psc.sc.gov

Verified programs

Electric Vehicle Make Ready Infrastructure Program MREV (SC), publicly branded 'Charger Prep Credit'up to $1,755maximum for a residential L2 installation

These are maximums set by a formula in the utility’s own tariff, not a flat rebate — what is paid can be less. The source link has the calculation. Other options run $150–$39,150 across 13 segments.

Open
All 13 amounts · $150–$39,150
Residential L2 (6.0-9.6 kW), existing premise, 5 years
up to $1,755
Residential L2, premise with Line Extension Plan, 1 year extra
up to $351
Multi-Family L2 (6.0-9.6 kW), 5 years
up to $2,004
Multi-Family L2, with Line Extension Plan, 2 years extra
up to $801
Multi-Family DCFC (50 kW), 5 years
up to $5,785
Multi-Family DCFC, with Line Extension Plan, 2 years extra
up to $2,314
Public L2 (6.0-9.6 kW), 3 years
up to $1,202
Workplace L2 (6.0-9.6 kW), 3 years
up to $905
Fleet L2 (6.0-19 kW), 3 years
up to $1,106
Public DCFC (50 kW), 3 years
up to $3,471
School Bus DCFC (50 kW), 3 years
up to $18,665
Transit Bus DCFC (50 kW), 3 years
up to $39,150
Homebuilder incentive, per newly-constructed home
up to $150
Who qualifies · 12 conditions
  • Make Ready Infrastructure must be installed on or after the program effective date of 2024-01-18
  • Must support Level 2 or higher EVSE, customer-owned, third-party owned or Company-owned; the Company will not own the Make Ready Infrastructure
  • Each L2 and DCFC EVSE 'must feature at least one charging plug meeting all applicable safety and reliability standards for the given charging level'
  • Installation must comply with nationally recognized testing laboratories, applicable electrical codes and building codes
  • 'The work to install Make Ready Infrastructure must be performed by a licensed electrician or a business employing licensed electricians'
  • Residential: application filed within 120 days following the latter of the most recent invoice date or the date of EV registration
  • Non-residential: application filed within 120 days following the latter of the most recent invoice date or the date on the approved permit
  • Required documents: itemized contractor invoices with labor and materials as separate line items, approved municipal/local permit, and (residential) evidence of EV registration
  • Non-residential must also submit a completed Customer Usage Profile form, plus a schematic for multi-EVSE or Level 3+ installations
  • Multi-family: building or complex with four or more housing units, EVSEs accessible to and primarily for residents
  • Customer must allow a Company representative to access the EVSE installation to verify compliance
  • Two delivery routes: Contractor Credit Option (credit applied by a Company-approved contractor in its quote) or Customer Credit Option (direct application)
VerifiedLast checked 2026-08-13etariff.psc.sc.gov

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate
  • EV Level 2 Charging Station Purchase Rebate
  • EV Direct Current (DC) Fast Charging Station Purchase Rebate
  • Make-Ready or Pre-Wiring Rebate for EV Chargers
  • EV Charger Deployment Pilot Programs
  • New EV Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Duke Energy's own published terms.

Questions about Duke Energy in South Carolina

How much does Duke Energy pay toward the electrical work for an EV charger install in South Carolina?

For residential, commercial, multifamily and fleet customers, Duke Energy's Electric Vehicle Make Ready Infrastructure Program MREV (SC), publicly branded 'Charger Prep Credit' in South Carolina is up to $1,755 maximum for a residential L2 installation toward the wiring (Open, checked 2026-08-13).

Does Duke Energy pay toward the electrical work for an EV charger install in South Carolina?

Yes. Duke Energy's Electric Vehicle Make Ready Infrastructure Program MREV (SC), publicly branded 'Charger Prep Credit' in South Carolina: Open, checked 2026-08-13 against Duke Energy's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives


Price the install for your address

Whatever Duke Energy does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.