Skip to the main content

EV charger installation in Texas: cost, rebates and permits

Texas is the hardest state in the country to answer the electric vehicle (EV) charger rebate question in, because in much of it the company on your bill is a retail electricity provider that does not own any wires. Charger rebates are sponsored by the utility that owns the distribution system, or by municipal utilities and cooperatives outside the competitive market — so the name on your bill is frequently the wrong place to look.

Federal credit status verified 2026-08-13. No Texas city has cleared the publish gate yet; utility-level records are in research.

Registered electric vehicles
230,125

Third-highest state total. Data predates the end of the federal purchase credits and should be treated as a floor, not a current figure.


Retail choice makes the usual shortcut wrong

In competitive parts of Texas, your retail electricity provider sells you energy and sends you the bill, while a separate transmission and distribution utility owns the poles, the wires and the meter. Incentive programs for charging equipment attach to the wires, not to the retail contract, which means switching provider does not change what you qualify for and the provider's name tells you almost nothing. Outside the competitive market, municipal utilities and member-owned cooperatives run the whole stack themselves and set their own programs. Three structures, three different places to look, in one state.

The federal charger credit has ended

There is no federal tax credit for an EV charger installed today — for a home or for a business. Public Law 119-21 moved the termination of the Section 30C Alternative Fuel Vehicle Refueling Property Credit to June 30, 2026, and both halves of it ended on that date: the 30% residential credit capped at $1,000 per port, and the business credit of 6% (30% with prevailing wage and apprenticeship) capped at $100,000 per item. The separate Section 30D and 25E clean-vehicle credits ended for deliveries after September 30, 2025.

No longer availableLast checked 2026-08-13
Xcel EnergyInvestor-owned
EV Time-of-Use (TOU) Rate
Not yet verified
Not yet verified
EV Time-of-Use (TOU) Rate
Not yet verified
Not yet verified
El Paso Electric CoInvestor-owned
Whole-House EV Rate Plan (Texas)
Open
$8/mo

ongoing bill credit, not an install rebate

VerifiedLast checked 2026-08-31
EntergyInvestor-owned
eTech Level 2 EV Charger Rebate
Open
$250

per port

VerifiedLast checked 2026-09-02
CPS EnergyMunicipal
EV Smart Rewards
Open
$10/mo

ongoing bill credit, not an install rebate

VerifiedLast checked 2026-08-20
Residential Level 2 EV Charging Station Rebate
Open — limited funding
$250

Capped at $500.

VerifiedLast checked 2026-08-25
Austin EnergyMunicipal
Home EV Charger Rebate
Open — limited funding
50%

of cost, up to $1,200

VerifiedLast checked 2026-09-17
Texas Gas ServiceInvestor-owned
Natural Gas Fueling Equipment Rebates
Not yet verified
Not yet verified
EV Charger Rebate
Open — limited funding
50%

of cost, up to $250

VerifiedLast checked 2026-08-25
Electric Vehicle Rebate
Open — limited funding
$1,000
VerifiedLast checked 2026-09-17
Fleet Electrification Assessment
Not yet verified
Not yet verified
CenterPoint EnergyInvestor-owned
Not yet verified
Not yet verified
TexasNot stated
Not yet verified
Not yet verified
OncorInvestor-owned
Retail Products -- Level 2 EV Charger Instant Discount
Open
$100
VerifiedLast checked 2026-08-31
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
MidCooperative
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
PenTex EnergyCooperative
Not yet verified
Not yet verified
CoServCooperative
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
TriCooperative
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
GraysonCooperative
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Residential Level 2 Home Charger Installation Rebate
Open
50%

of cost, up to $600

VerifiedLast checked 2026-08-25
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Liberty UtilitiesInvestor-owned
EV Time-of-Use (TOU) Rate
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified
Not yet verified

State-level programs

Not yet reviewed against primary sources. This section stays empty rather than repeating aggregator summaries.

Right to charge in condominiums and HOAs

Not yet verified. We make no claim about what a Texas association can or cannot prohibit until the statute is read and cited.

Who is allowed to do the work

Electrical contractor licensing in Texas is administered at state level. We have not yet verified the current licence classes or the public lookup URL, so this section carries no specifics.

Which electrical code applies

Adoption in Texas happens at both state and municipal level, and large cities commonly amend. Published per city rather than per state once researched.

What drives installed cost in Texas

Not yet researched to a standard we would publish. The national cost model applies in the estimate tool in the meantime, with no state adjustment claimed.


0

Cities on the record

No city in this state has cleared the publish gate. The state-level record above does not depend on them — it is written to stand on its own.


4

In research

These cities are still being researched. Each moves up when it clears every check on the publish gate; where we have started a record, its page lists exactly which checks are outstanding.

  • Austin6 checks outstanding
  • HoustonDistribution utility identified, program review not started.
  • San AntonioMunicipal utility identified, program review not started.
  • DallasDistribution utility identified, program review not started.

Get your own range for this address

Instant estimate
1/16

What will my EV charger installation cost?

Start with what you are charging. A garage wall and a twelve-port depot have nothing in common but the wizard.

A licensed installer confirms your final price on site.

My Texas electricity provider is not on your list. Why?

Because in competitive parts of Texas your provider sells energy and does not own wires, and charger rebates are sponsored by the wires company. Look at the transmission and distribution utility named on your bill, usually in smaller print near the delivery charges. That is the entity whose programs apply to you.

Why are there no Texas city pages yet?

Because none has cleared our publish gate. A city page requires a verified serving utility and a sourced permit authority at minimum. Publishing a Texas city page before the retail-versus-wires distinction is resolved would produce a confidently wrong answer, which is worse than no page.