United Power and your EV charger
United Power offers 1 electric vehicle (EV) program in Colorado that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.
Federal listing checked 2026-08-25
| Program | Type | Who qualifies | Amount | Status | Checked | Source |
|---|---|---|---|---|---|---|
| EV Make-Ready Wiring Rebate + Panel Upgrade Rebate | Electrical work, toward the wiring | Residential | $500–$1,000 | Open — limited funding, ends 2027-06-30 | 2026-08-20 | unitedpower.com |
Verified programs
- Permanent, residential electric service from United Power
- The two wiring-rebate options are mutually exclusive — a member takes one, not both
- UnitedEV wiring applications must be submitted within 90 days of installation
- For the higher UnitedEV-enrolled tier, the outlet must be located within 12 inches of the charger location
- Panel rebate covers 'electrical panel replacements or new subpanel additions supporting Level 2 charger installation'
Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.
Listed by the Department of Energy
- EV Level 2 Charging Station Purchase Rebate
- EV Level 2 Charging Station Installation Rebate
- Make-Ready or Pre-Wiring Rebate for EV Chargers
- EV Direct Current (DC) Fast Charging Station Purchase Rebate
- EV Direct Current (DC) Fast Charging Station Installation Rebate
Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from United Power's own published terms.
Questions about United Power in Colorado
How much does United Power pay toward the electrical work for an EV charger install in Colorado?
For residential customers, United Power's EV Make-Ready Wiring Rebate + Panel Upgrade Rebate in Colorado is $500–$1,000 toward the wiring (Open — limited funding, ends 2027-06-30, checked 2026-08-20).
Does United Power pay toward the electrical work for an EV charger install in Colorado?
United Power's EV Make-Ready Wiring Rebate + Panel Upgrade Rebate in Colorado: Open — limited funding, ends 2027-06-30, checked 2026-08-20 against United Power's own published terms.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.unitedpower.com/EV
Price the install for your address
Whatever United Power does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.