Ocala Electric Utility and your EV charger
Ocala Electric Utility does not offer an EV charger incentive. We confirmed that against the utility's own published rebate listing rather than inferring it from an absence, which is why it carries a verified stamp. The federal charger credit also ended for installs after June 30, 2026, so there is no federal money to fall back on — the cost of a Level 2 install is the cost.
Federal listing checked null
Confirmed: nothing offered
Not in the federal directory
The Department of Energy’s Alternative Fuels Data Center does not carry a listing for Ocala Electric Utility. That is a gap in the federal directory rather than a statement about this utility — what appears above was read directly from the utility’s own published material.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.ocalafl.gov/government/electric-utility/rebates
Price the install for your address
Whatever Ocala Electric Utility does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.