Skip to the main content
Cooperative · Georgia

Greystone Power Corporation and your EV charger

Greystone Power Corporation offers 1 electric vehicle (EV) program in Georgia that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

Greystone Power Corporation EV programs in Georgia: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Level 2 EV Charger RebateEV charger rebateResidential$250Open2026-08-25greystonepower.com

Verified programs

Level 2 EV Charger Rebate$250
Open
Who qualifies · 8 conditions
  • Residential GreyStone Power member
  • Charger must be Level 2, UL safety rated
  • Must be hardwired and mounted (photo of completed hardwired/mounted install required)
  • Purchase and installation must be within the last 90 days of application
  • NEMA 14-50 adapters and portable chargers do NOT qualify
  • 1 rebate per household
  • Full purchase receipt required (retailer, date, charger details, amount paid)
  • Installation may be subject to on-site verification before approval
VerifiedLast checked 2026-08-25greystonepower.com

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate
  • EV Level 2 Charging Station Purchase Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Greystone Power Corporation's own published terms.

Questions about Greystone Power Corporation in Georgia

How much is the Greystone Power Corporation EV charger rebate in Georgia?

For residential customers, Greystone Power Corporation's Level 2 EV Charger Rebate in Georgia is $250 (Open, checked 2026-08-25).

Is the Greystone Power Corporation EV charger rebate still available in Georgia?

Yes. Greystone Power Corporation's Level 2 EV Charger Rebate in Georgia: Open, checked 2026-08-25 against Greystone Power Corporation's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.greystonepower.com/


Price the install for your address

Whatever Greystone Power Corporation does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.