Greystone Power Corporation and your EV charger
Greystone Power Corporation offers 1 electric vehicle (EV) program in Georgia that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.
Federal listing checked 2026-08-25
| Program | Type | Who qualifies | Amount | Status | Checked | Source |
|---|---|---|---|---|---|---|
| Level 2 EV Charger Rebate | EV charger rebate | Residential | $250 | Open | 2026-08-25 | greystonepower.com |
Verified programs
- Residential GreyStone Power member
- Charger must be Level 2, UL safety rated
- Must be hardwired and mounted (photo of completed hardwired/mounted install required)
- Purchase and installation must be within the last 90 days of application
- NEMA 14-50 adapters and portable chargers do NOT qualify
- 1 rebate per household
- Full purchase receipt required (retailer, date, charger details, amount paid)
- Installation may be subject to on-site verification before approval
Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.
Listed by the Department of Energy
- EV Time-of-Use (TOU) Rate
- EV Level 2 Charging Station Purchase Rebate
Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Greystone Power Corporation's own published terms.
Questions about Greystone Power Corporation in Georgia
How much is the Greystone Power Corporation EV charger rebate in Georgia?
For residential customers, Greystone Power Corporation's Level 2 EV Charger Rebate in Georgia is $250 (Open, checked 2026-08-25).
Is the Greystone Power Corporation EV charger rebate still available in Georgia?
Yes. Greystone Power Corporation's Level 2 EV Charger Rebate in Georgia: Open, checked 2026-08-25 against Greystone Power Corporation's own published terms.
Where the federal credit went
There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.
Utility’s own page: https://www.greystonepower.com/
Price the install for your address
Whatever Greystone Power Corporation does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.