Presque Isle Electric & Gas Co offers 1 electric vehicle (EV) program in Michigan that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked. Presque Isle Electric & Gas Co's rebate toward the panel and wiring work a charger install requires has ended — listed below with the date, because a closed program is still the answer to whether that money exists.

Federal listing checked 2026-08-25

Presque Isle Electric & Gas Co EV programs in Michigan: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Residential Level 2 (L2) Charging Station RebateEV charger rebateResidential$600Ended 2025-12-312026-08-31pieg.com
Electrical Panel Upgrade Rebate (2025 program year; not renewed in the current 2026 schedule)Electrical work, toward the panel upgradeResidential; only with another program or measure$500Ended 2025-12-312026-08-31pieg.com

Verified programs

Residential Level 2 (L2) Charging Station Rebate$600
Ended 2025-12-31
Who qualifies · 4 conditions
  • Presque Isle Electric & Gas Co-op residential electric member
  • ENERGY STAR certified Level 2 charging station
  • Licensed Michigan electrical contractor installation and electrical permit required
  • Applied ONLY to the 2025 program year -- the 2026 successor document omits this category
VerifiedLast checked 2026-08-31pieg.com
Also from Presque Isle Electric & Gas Co · Toward the electrical work the install requires

A charger quote is really a charger-plus-electrical quote, and this is money for the second half — the panel, the circuit, or a device that lets you avoid the upgrade. Every figure is a maximum under the sponsor’s own terms, not an amount anyone is guaranteed, and none of it is added to the charger rebates above: they pay for different work and are applied for separately.

toward the panel upgrade
Electrical Panel Upgrade Rebate (2025 program year; not renewed in the current 2026 schedule)$500

Only alongside: Per the sponsor's own 2025 application (now expired), the panel had to be connected to at least one of: Heat Pump, Heat Pump Water Heater, Heat Pump Dryer, Induction Range/Stove, or Residential Level 2 Charging Station. The EV charger was an explicitly named, sufficient qualifying measure on its own while this program was active.

Ended 2025-12-31
Who qualifies · 5 conditions
  • Presque Isle Electric & Gas Co-op residential electric member
  • Licensed Michigan electrical contractor installation and electrical permit required
  • If replacing the main service panel, minimum 200 amp post-upgrade capacity required
  • Panel must be connected to at least one of: Heat Pump, Heat Pump Water Heater, Heat Pump Dryer, Induction Range/Stove, or Residential Level 2 Charging Station
  • Applied ONLY to the 2025 program year -- the 2026 successor document omits this category entirely
VerifiedLast checked 2026-08-31pieg.com

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Level 2 Charging Station Purchase Rebate
  • New EV Rebate
  • Pre-Owned EV Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Presque Isle Electric & Gas Co's own published terms.

Questions about Presque Isle Electric & Gas Co in Michigan

How much is the Presque Isle Electric & Gas Co EV charger rebate in Michigan?

For residential customers, Presque Isle Electric & Gas Co's Residential Level 2 (L2) Charging Station Rebate in Michigan is $600 (Ended 2025-12-31, checked 2026-08-31).

Is the Presque Isle Electric & Gas Co EV charger rebate still available in Michigan?

No. Presque Isle Electric & Gas Co's Residential Level 2 (L2) Charging Station Rebate in Michigan: Ended 2025-12-31, checked 2026-08-31 against Presque Isle Electric & Gas Co's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://pieg.com/energy-optimization-rebates/


Price the install for your address

Whatever Presque Isle Electric & Gas Co does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.