Skip to the main content
Not stated · Missouri

City Utilities of Springfield, Missouri and your EV charger

City Utilities of Springfield, Missouri offers 1 electric vehicle (EV) program in Missouri that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked. City Utilities of Springfield, Missouri also has 1 verified program that pays toward the electrical work a charger install requires — the panel, the circuit, or a device that lets you skip the upgrade. It is listed below as its own line item and is deliberately not added to the charger figures: a panel rebate and a charger rebate buy different work.

Federal listing checked null

City Utilities of Springfield, Missouri EV programs in Missouri: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
Residential EV Charger RebateEV programResidential50% of cost, up to $500Open2026-09-02cityutilities.net
Residential EV Home Upgrade Rebate (240V outlet)Electrical work, toward the wiringResidential50% of cost, up to $500Open2026-09-02cityutilities.net

Verified programs

Residential EV Charger Rebate50%of cost, up to $500
Open
Who qualifies · 3 conditions
  • Current City Utilities (CU) residential electric customer
  • Wi-Fi-enabled Level 2 charger
  • Maximum two rebates per service address (this + the Home Upgrade outlet rebate combined)
VerifiedLast checked 2026-09-02cityutilities.net
Also from City Utilities of Springfield, Missouri · Toward the electrical work the install requires

A charger quote is really a charger-plus-electrical quote, and this is money for the second half — the panel, the circuit, or a device that lets you avoid the upgrade. Every figure is a maximum under the sponsor’s own terms, not an amount anyone is guaranteed, and none of it is added to the charger rebates above: they pay for different work and are applied for separately.

toward the wiring
Residential EV Home Upgrade Rebate (240V outlet)50%of cost, up to $500
Open
Who qualifies · 3 conditions
  • Existing City Utilities (CU) residential customer
  • 240V NEMA 6-50 or NEMA 14-50 outlet install
  • Maximum two rebates per service address (combined with the charger rebate)
VerifiedLast checked 2026-09-02cityutilities.net

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Not in the federal directory

The Department of Energy’s Alternative Fuels Data Center does not carry a listing for City Utilities of Springfield, Missouri. That is a gap in the federal directory rather than a statement about this utility — what appears above was read directly from the utility’s own published material.

Questions about City Utilities of Springfield, Missouri in Missouri

How much does City Utilities of Springfield, Missouri pay toward the electrical work for an EV charger install in Missouri?

For residential customers, City Utilities of Springfield, Missouri's Residential EV Home Upgrade Rebate (240V outlet) in Missouri is 50% of cost, up to $500 toward the wiring (Open, checked 2026-09-02).

Does City Utilities of Springfield, Missouri pay toward the electrical work for an EV charger install in Missouri?

Yes. City Utilities of Springfield, Missouri's Residential EV Home Upgrade Rebate (240V outlet) in Missouri: Open, checked 2026-09-02 against City Utilities of Springfield, Missouri's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.cityutilities.net/168/Electric-Vehicle-Charging-Rebates


Price the install for your address

Whatever City Utilities of Springfield, Missouri does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.