Which states require EV-ready parking in new apartment construction?

Whether new apartment construction must include EV-ready parking depends on the state, not a national rule. This review independently verified statewide mandates in three states as of September 2026 — California (100% of assigned spaces, effective January 2026), Washington (effective March 2024) and Colorado (effective March 2024) — plus New York City's separate Local Law 55.

Updated 2026-09-02

Does every state require EV-ready parking in new apartment buildings?

No. As of September 2026, this review independently verified statewide EV-ready or EV-capable parking mandates for new multifamily construction in exactly three states: California, Washington and Colorado. That is a checked count, not a complete national count — most states were not researched in this pass, and a state's absence from this page means unresearched, not confirmed to have no requirement. Some cities also layer their own requirement on top of, or in the absence of, a state rule; New York City is one, covered separately below. Always confirm the current requirement with the project's own building department before designing to a number from this page.

Which states have a verified statewide EV-ready parking mandate for new apartments?

California, Washington and Colorado, checked against a government or code-hosting source in September 2026. Each state defines the requirement differently — by percentage of spaces, by category of space, and on a different effective date — so the table below states each one's own terms rather than a single blended rule.

States with a verified statewide EV-ready parking mandate for new multifamily construction, checked September 2026
StateCode or statuteWhat new multifamily construction must provideEffective date
CaliforniaCalifornia Green Building Standards Code (CALGreen) §4.106.4.2.2A low-power Level 2 EV-ready receptacle at every assigned parking space (100% where assigned spaces equal or exceed dwelling units), plus installed Level 2 chargers at 25% of unassigned/common spacesJanuary 1, 2026
WashingtonWashington State Building Code, WAC 51-50-0429, Table 429.2 (Group R occupancies)10% of total parking spaces as installed EV Charging Stations, 25% as EV-Ready, 10% as EV-CapableMarch 15, 2024
ColoradoColorado Model Electric Ready and Solar Ready Code, adopted under HB22-1362 (2022) with adoption timing set by HB23-1233 (2023)A statewide requirement that new multifamily construction provide EV-ready electrical capacity for a share of parking spaces; the figure commonly cited is 20%, but this review could not independently confirm that percentage against the state's own code text (blocked on every attempt) — verify the current figure with the Colorado Division of Housing before designing to itMarch 1, 2024
California and Washington rows are read directly from the adopted code text. The Colorado row's legal existence and effective date are confirmed directly from the Colorado General Assembly's own bill pages; its percentage figure is attributed to municipal-government pages reproducing the state's explanatory notes and is explicitly not independently verified in this pass.

What does California's CALGreen code actually require for new apartment parking?

California's 2025 CALGreen code, effective January 1, 2026, requires a complete EV-ready circuit — not just conduit — at essentially every assigned parking space in new multifamily construction. Under §4.106.4.2.2, where a building provides assigned parking spaces equal to or greater than the number of dwelling units, every assigned space must have a low-power Level 2 EV charging receptacle; where assigned spaces are fewer than dwelling units, all assigned spaces must have one. On top of that, at least 25% of unassigned or common-use parking spaces must have an installed Level 2 EV charger, not just wiring, available to residents and guests. This is a stricter standard than a conduit-only 'EV-capable' requirement — California's code goes straight to a working receptacle at nearly every assigned stall.

What does Washington's state building code require?

Washington's state building code splits the requirement across three tiers instead of one number. Under WAC 51-50-0429, Table 429.2, a new Group R (multifamily) building must provide EV Charging Stations — chargers actually installed and energized — at 10% of total parking spaces, EV-Ready spaces (a complete circuit with no charger yet installed) at 25%, and EV-Capable spaces (reserved panel capacity and conduit, no circuit run) at a further 10%. That means 45% of total parking spaces carry some tier of EV infrastructure obligation, split across three different levels of build-out. The rule took effect March 15, 2024.

What does Colorado require, and what's still unconfirmed about it?

Colorado requires new multifamily construction to provide EV-ready parking capacity statewide, but this review can confirm the legal requirement and its effective date with more confidence than it can confirm the exact percentage. HB22-1362 (2022) directed the state to develop a model 'electric ready and solar ready' code; HB23-1233 (2023) set the adoption and enforcement timing, with rules effective March 1, 2024 and a bona-fide-safety-concern standard for any local deviation. The specific figure widely reported for multifamily EV-ready spaces is 20% of parking spaces, sourced in this pass to municipal-government pages that reproduce the state's own explanatory notes rather than to the code document itself, which returned a blocked request on every attempt. Confirm the exact current percentage with the Colorado Division of Housing or a local building department before using it in a design.

Does New York State require EV-ready parking in new apartment buildings?

No, as of September 2026 New York State has no statewide EV-ready parking mandate for new multifamily construction. A bill that would have created one, S7406C, would have required 75% EV-capable parking with at least 20% charger-equipped for buildings with 2–10 spaces, and 100% EV-capable with at least 40% charger-equipped for buildings with 11 or more spaces, effective April 1, 2023. Checked directly against its own status page at the New York Senate's website: S7406C passed the Senate in June 2022 but never came to a vote in the Assembly committee where it was referred, and it was not enacted. New York has no equivalent statewide statute in force in its place. This is a confirmed absence, not an unresearched one.

Does my city require EV charging infrastructure in new apartments even if my state doesn't?

Possibly — some cities set their own requirement independent of the state, and New York City is a documented example, though this review could not independently confirm its exact terms. New York City's Local Law 55 of 2024 requires open parking lots and parking garages with 10 or more spaces that need a Department of Consumer and Worker Protection license to provide EV charging capability, with a higher share required for new or substantially altered facilities than for existing ones. Multiple legal and industry sources describe the new-construction share as 20% of spaces with an installed charger and 60% EV-ready, but the law's own text at nyc.gov returned a blocked automated request on every attempt in this pass, so those percentages are not independently confirmed here. A project team in New York City should get the current requirement directly from the NYC Department of Buildings rather than from this page.

What's the difference between 'EV-capable,' 'EV-ready' and an 'EV charging station'?

Under both Washington's and California's codes, the three terms mark different amounts of finished electrical work, from least to most: EV-capable means reserved panel capacity and empty conduit run to the space, with no circuit and no receptacle yet; EV-ready means a complete dedicated branch circuit terminating in a receptacle at the space, ready to accept a charger with no further electrical work; and an EV charging station (sometimes called EV-installed) means an actual Level 2 charger is physically mounted and energized. California's 2025 code moves almost directly to the EV-ready tier for assigned spaces rather than stopping at EV-capable, while Washington's code uses all three tiers side by side, at different percentages of the same parking count. The terms are not standardized across every state that uses them — read the definitions section of the specific code that applies to a project rather than assuming one state's usage matches another's.

Which states mandate EV-ready parking spaces in new multifamily construction?

This review independently verified statewide mandates in three states as of September 2026: California, effective January 1, 2026, requiring a complete EV-ready circuit at nearly every assigned parking space; Washington, effective March 15, 2024, splitting the requirement across EV-Capable, EV-Ready and installed EV Charging Station tiers; and Colorado, effective March 1, 2024, requiring EV-ready capacity statewide under its Model Electric Ready and Solar Ready Code. Most other states were not researched in this pass, so their absence here should not be read as a confirmed no.

What does the EV-ready parking requirement under California's Title 24 / CALGreen actually require?

Under the 2025 CALGreen code, §4.106.4.2.2, effective January 1, 2026, new multifamily construction must provide a low-power Level 2 EV-ready receptacle at essentially every assigned parking space, and install a working Level 2 EV charger at 25% of unassigned or common-use spaces. This is a complete-circuit 'EV-ready' standard for assigned spaces, not a conduit-only 'EV-capable' one, and it applies to new residential, hotel and commercial construction covered by the code, not to existing buildings undergoing no qualifying work.

Does my city require EV charging infrastructure in new apartments?

It depends on the city, separately from whatever the state requires. New York City is a documented example: Local Law 55 of 2024 requires licensed parking garages and lots with 10 or more spaces, including new or substantially altered ones, to provide EV charging capability. The exact percentages reported for new construction (commonly cited as 20% installed, 60% EV-ready) could not be independently confirmed against the law's own text in this review, so verify the current figure with the city's building department before relying on it.

Does New York require EV-ready parking in new apartment buildings?

New York State does not, as of September 2026. A bill that would have created a statewide requirement, S7406C, passed the New York Senate in 2022 but died in an Assembly committee and was never enacted, confirmed directly against its status page on the State Senate's own website. New York City has its own separate Local Law 55, which is not the same as a statewide rule and applies only within city limits.

What's the difference between an EV-capable space and an EV-ready space?

An EV-capable space has reserved electrical panel capacity and an empty conduit run to the parking space, with no circuit or receptacle installed yet — it is a cheaper, earlier build-out step. An EV-ready space goes further: a complete dedicated branch circuit terminates in a receptacle at the space, ready for a charger with no additional electrical work. Washington's state code uses both terms as separate, smaller percentage tiers; California's 2025 code moves close to requiring the EV-ready tier directly for assigned multifamily spaces rather than stopping at EV-capable.

Is there a federal requirement for EV-ready parking in new apartment construction?

No. There is no federal building-code mandate requiring EV-ready or EV-capable parking in new multifamily construction anywhere in the country; every requirement identified in this review comes from a state code or a city ordinance, never a federal one. This is a separate question from the federal EV charger tax credit, Section 30C, which is unrelated to a building-code parking mandate and is itself $0 for property placed in service after June 30, 2026.

How these figures were calculated

This page lists only jurisdictions independently checked against a government or code-hosting source in September 2026. A state's absence from the tables below means it was not researched in this pass, not that it has been confirmed to have no requirement. Where a specific percentage could not be confirmed against a primary code document, that is stated inline rather than presented as settled. This is a summary of publicly adopted code and statute text, not legal or code-compliance advice — confirm current requirements with the local building department before designing to a number on this page.


Model the build-out before the code review does

Tell the estimate tool the unit count, assigned-space count and your state, and it returns a modelled EV-ready or EV-capable build-out range you can bring into a pre-application meeting.