Skip to the main content
Municipal · California

Alameda Municipal Power and your EV charger

Alameda Municipal Power offers 6 electric vehicle (EV) programs in California that we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked 2026-08-25

Alameda Municipal Power EV programs in California: amount, who qualifies, funding status and date checked
ProgramTypeWho qualifiesAmountStatusCheckedSource
EV Charger Rebate (standard tier)EV charger rebateResidential$200Open — limited funding2026-08-25alamedamp.com
EV Charger Rebate (means-tested higher tier)EV charger rebateResidential; income-qualified only$500Open — limited funding2026-08-25alamedamp.com
EV Ready Multifamily Rebate -- Level 1/Level 2 Dedicated OutletEV programMultifamily$3,000 per portStatus not confirmed2026-09-04alameda.upgrade.guide
EV Ready Multifamily Rebate -- Level 2 Charging Stations (1 to 3 spaces)EV charger rebateMultifamily$8,000 per portStatus not confirmed2026-09-04alameda.upgrade.guide
EV Ready Multifamily Rebate -- Level 2 Charging Stations (4 or more spaces)EV charger rebateMultifamily75% of cost, up to $50,000Status not confirmed2026-09-04alameda.upgrade.guide
Public EV Charging Program -- Business/Commercial (standard rebate)EV charger rebateCommercial50% of cost, up to $50,000Status not confirmed2026-09-04alameda.upgrade.guide

Verified programs

EV Charger Rebate (standard tier)$200
Open — limited funding
Who qualifies · 2 conditions
  • Current AMP residential (D1) electric customer
  • One rebate per customer account
VerifiedLast checked 2026-08-25alamedamp.com
EV Charger Rebate (means-tested higher tier)$500
Open — limited funding
Who qualifies · 3 conditions
  • Current AMP residential (D1) electric customer
  • One rebate per customer account
  • This tier requires enrollment verification under AMP's household-earnings-based eligibility criteria (specific program not itemized on AMP's page)
VerifiedLast checked 2026-08-25alamedamp.com
EV Ready Multifamily Rebate -- Level 1/Level 2 Dedicated Outlet$3,000per port

Capped at $50,000.

Status not confirmed
Who qualifies · 2 conditions
  • Multifamily residential property, per AMP's EV Ready program
  • Property must be in AMP's service territory
VerifiedLast checked 2026-09-04alameda.upgrade.guide
EV Ready Multifamily Rebate -- Level 2 Charging Stations (1 to 3 spaces)$8,000per port
Status not confirmed
Who qualifies · 1 condition
  • Multifamily residential property installing 1 to 3 Level 2 charging stations, per AMP's EV Ready program
VerifiedLast checked 2026-09-04alameda.upgrade.guide
EV Ready Multifamily Rebate -- Level 2 Charging Stations (4 or more spaces)75%of cost, up to $50,000
Status not confirmed
Who qualifies · 2 conditions
  • Multifamily residential property installing 4 or more Level 2 charging stations, per AMP's EV Ready program
  • Properties must be within income-eligible areas, per AMP's own page
VerifiedLast checked 2026-09-04alameda.upgrade.guide
Public EV Charging Program -- Business/Commercial (standard rebate)50%of cost, up to $50,000
Status not confirmed
Who qualifies · 3 conditions
  • Alameda Municipal Power business/commercial customer, rate category A1, A2, A3 or M1
  • Level 2 charging station accessible to the public without access cards or identification codes
  • Chargers must be publicly accessible
VerifiedLast checked 2026-09-04alameda.upgrade.guide

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Listed by the Department of Energy

  • EV Time-of-Use (TOU) Rate
  • EV Level 2 Charging Station Purchase Rebate
  • Pre-Owned EV Rebate

Names as published by the Alternative Fuels Data Center, checked 2026-08-25. The federal listing carries no amounts; the figures above come from Alameda Municipal Power's own published terms.

Questions about Alameda Municipal Power in California

How much is the Alameda Municipal Power EV charger rebate in California?

Alameda Municipal Power in California has 2 EV charger rebates: EV Charger Rebate (standard tier) is $200 (Open — limited funding, checked 2026-08-25) for residential customers; EV Charger Rebate (means-tested higher tier) is $500 (Open — limited funding, checked 2026-08-25) for residential customers who meet its income qualification.

Is the Alameda Municipal Power EV charger rebate still available in California?

Alameda Municipal Power in California: EV Charger Rebate (standard tier), Open — limited funding, checked 2026-08-25; EV Charger Rebate (means-tested higher tier), Open — limited funding, income-qualified only, checked 2026-08-25. Each was checked against Alameda Municipal Power's own published terms.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.alamedamp.com/349/Electric-Vehicles


Price the install for your address

Whatever Alameda Municipal Power does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.