Does the EPA DERA Grant Fund Electric Truck Replacement?

The EPA Diesel Emissions Reduction Act, or DERA, National Grants program funds diesel truck and engine replacement, repower, and retrofit, not charging equipment. Its most recent National Grants round, FY2022 to FY2023, totaled about $115 million and closed in 2023. No FY2026 round has been announced as of September 2026.

Updated 2026-09-02

Does the EPA DERA Grant Fund Electric Truck Chargers?

No. The EPA Diesel Emissions Reduction Act (DERA) National Grants program funds diesel vehicle and engine replacement, repower, retrofit and idle-reduction, not charging equipment. EPA's own DERA National Grants page states plainly that equipment for testing emissions or fueling infrastructure is not eligible for funding under the program. A fleet planning an electric truck replacement can use DERA money for the truck itself, through an eligible activity like an all-electric replacement or repower, but the charging depot, the make-ready electrical work and the utility service upgrade that depot needs are a separate cost DERA does not cover. A DERA award pays for one side of an electrification project, and the charging infrastructure side needs its own funding path, whether that is a utility make-ready program, a state grant or the fleet's own capital budget.

What Does the DERA National Grants Program Actually Fund?

The DERA National Grants program funds four categories of diesel vehicle and engine work, per EPA's own program page: replacement of an older diesel vehicle or engine with a new one, including an all-electric replacement; repower of an existing vehicle with a newer, cleaner engine; verified emissions-control retrofit; and idle-reduction technology such as auxiliary power units. Trucks, buses and non-road diesel equipment, including construction machinery and marine engines, are all eligible vehicle classes under the program's authorizing statute. Model year and vehicle class restrictions apply and are set fresh in each funding opportunity's own notice of funding availability, so a fleet checking DERA eligibility for a specific truck needs the current NOFO's eligibility table, not a general description like this one.

Is a 2026 DERA National Grants Funding Round Open?

No. As of September 2026, EPA has not announced a new DERA National Grants funding opportunity for FY2025 or FY2026. The most recent round covered combined FY2022 and FY2023 appropriations of about $115 million, closed to new applications on December 1, 2023, with awards anticipated between June and August 2024. EPA's DERA program page, last updated August 11, 2026 per its own footer, does not list a successor National Grants notice, so a fleet manager checking for a current opportunity should confirm directly at epa.gov/dera rather than rely on a date from a secondary source.

EPA Diesel Emissions Reduction Act National Grants funding rounds, per EPA's own program pages checked September 2, 2026.
Funding roundAppropriationStatus as of September 2026
FY2022-FY2023 National Grants (combined NOFO)$115 million ($58 million FY2022 + $57 million FY2023)Closed. Applications were due December 1, 2023; awards anticipated June-August 2024
FY2025 National GrantsNot announcedNo funding opportunity has been posted
FY2026 National GrantsNot announcedNo funding opportunity has been posted
EPA does not publish a single running total of DERA funds obligated or remaining, so no balance figure is given beyond the appropriation amounts EPA states directly for the FY2022-FY2023 round.

Can a Fleet Combine DERA Money With a Charging Depot Build?

Yes, but as two separate funding streams, not one combined award. A DERA National Grants award, when a round is open, pays for the diesel-to-electric truck or engine replacement itself; it does not pay for the charger, the panel, the transformer or the utility make-ready work the depot needs, since EPA's own program page excludes fueling infrastructure from eligible costs. A fleet building a depot alongside a DERA-funded truck replacement typically funds the charging side through a utility make-ready program, a state or utility charger rebate, or its own capital budget, and schedules the two work streams against each other rather than assuming one grant covers both.

Does DERA Fund One Charging Unit Per Replaced Vehicle?

The claim that DERA pays for one charging unit per replaced truck could not be confirmed against any EPA DERA National Grants page or funding notice. EPA's own eligible-activities list covers only vehicle and engine replacement, repower, retrofit and idle reduction; it explicitly excludes fueling and charging infrastructure. The claim most likely describes a different, state-run program that also uses the word DERA in its name, such as Massachusetts's 'DERA Electric Solicitation Grant.' A fleet that has heard this claim should confirm which specific program, state or federal, is actually being described before budgeting around it.

Where Can a Fleet Check DERA's Current Funding Status?

EPA's own DERA program page, epa.gov/dera, and its DERA National Grants page, epa.gov/dera/national, are the two pages that carry current eligibility and funding-round status. Both were checked directly for this article on September 2, 2026; the main program page shows a last-updated date of August 11, 2026, and neither lists an open FY2025 or FY2026 National Grants opportunity. A fleet manager tracking DERA for a 2026 or 2027 electrification plan should check those two pages directly rather than a secondary source, because a program under active budget cycles can change between any two check dates.

Does the EPA DERA grant pay for EV charging stations?

No. The EPA Diesel Emissions Reduction Act (DERA) National Grants program funds diesel vehicle and engine replacement, repower, retrofit and idle-reduction, not chargers or fueling infrastructure. EPA's own DERA National Grants page states that equipment for fueling infrastructure is not eligible for funding under the program. A fleet using DERA money to replace a diesel truck with an electric one still needs a separate funding source, such as a utility make-ready program or a state charger rebate, to pay for the charging depot that truck needs.

What is the EPA Diesel Emissions Reduction Act (DERA) program?

DERA is a federal grant program EPA runs to reduce emissions from existing diesel vehicles and engines through replacement, repower, verified retrofit and idle-reduction technology. It covers trucks, buses and non-road diesel equipment such as construction and marine engines, funded through competitive National Grants and, in some years, state-allocated formula grants. DERA is a vehicle and engine program, not a charging-infrastructure program: EPA's own program page excludes fueling and charging equipment from eligible costs.

Is DERA National Grants funding open for fleet electrification in 2026?

No. As of September 2026, EPA has not announced a DERA National Grants funding opportunity for FY2025 or FY2026. The most recent round covered combined FY2022 and FY2023 appropriations, closed to new applications December 1, 2023, and anticipated awards between June and August 2024. EPA's DERA program page, last updated August 11, 2026, lists no successor National Grants notice. A fleet planning around DERA money should check epa.gov/dera directly for the current status rather than assume a round is open.

How much funding did EPA's last DERA National Grants round provide?

EPA's most recent DERA National Grants round combined FY2022 and FY2023 appropriations for a total of about $115 million: $58 million from FY2022 and $57 million from FY2023. Applications for that combined round were due December 1, 2023, and EPA anticipated announcing awards between June and August 2024. No dollar figure has been published for a successor round, because none has been announced as of September 2026.

Does DERA fund one charging unit for every truck it replaces?

The claim that DERA pays for one charging unit per replaced truck could not be confirmed against any EPA DERA National Grants page or funding notice. EPA's own eligible-activities list covers only vehicle and engine replacement, repower, retrofit and idle reduction; it explicitly excludes fueling and charging infrastructure. The claim most likely describes a different, state-run program that also uses the word DERA in its name, such as Massachusetts's 'DERA Electric Solicitation Grant.' Confirm which specific program, state or federal, is actually being described before budgeting around this claim.

Where can a fleet manager check DERA's current funding status directly?

EPA's own DERA program page at epa.gov/dera and its DERA National Grants page at epa.gov/dera/national carry the current eligibility rules and funding-round status. Checked directly on September 2, 2026, the main program page showed a last-updated date of August 11, 2026 and listed no open FY2025 or FY2026 National Grants opportunity. Because DERA's funding cycle depends on annual appropriations and a new notice can post at any time, a fleet manager should check those two EPA pages directly rather than rely on a secondhand summary, including this one.

How these figures were calculated

The $115 million combined FY2022-FY2023 figure ($58 million FY2022 + $57 million FY2023), the December 1, 2023 application deadline, and the June-August 2024 anticipated-awards window are quoted directly from EPA's own DERA program pages. No FY2025 or FY2026 funding amount, application deadline, or reopening date is stated anywhere in this article, because EPA has not published one as of the 2026-09-02 check.


Scope the Charging Depot Separately From Any DERA Award

DERA money, when a round is open, pays for the truck. The charging depot it plugs into is a separate project with its own cost and timeline. Tell the estimate tool your fleet size, dwell window and existing electrical service to get a modelled installed range you can budget alongside a DERA application or any other vehicle-replacement funding.