Guides
commercial fleet
Getting power: utility, make-ready and timelines
- How to apply for a utility make-ready program
- Does your depot need a service upgrade for EV charging?
- How to send a load letter for a charging depot
- Fleet charging project timeline: how long to energisation
- Single-phase or three-phase for a charging depot?
- What does it cost to bring three-phase power to a fleet yard?
- Transformer lead times on EV charging projects
- What utility make-ready actually covers
- Who pays for the transformer on an EV charging project?
Power management and energy cost
- Is battery storage worth it at a charging depot?
- Is there a special utility rate for commercial EV charging?
- Cost Per Mile to Charge a Class 8 Electric Semi Truck
- What it costs to charge an electric fleet per mile
- What are demand charges, and what do they do to fleet charging?
- Load management for fleet charging: the three architectures
- How to choose managed charging software for a fleet
- How to cut demand charges at a charging depot
- Can solar power a fleet charging depot?
Depot design and sizing
Money: capex, phasing, incentives, TCO
- Charging as a service for fleets: what you are buying
- Electric vs diesel van: total cost of ownership
- EPA Clean School Bus Program: Is 2026 Funding Still Available?
- Is there a federal tax credit for fleet EV chargers?
- Rebuilding a fleet charging business case without the credit
- Fleet EV charging cost per port
- What fleet charging incentives are left after the federal credit
- How to Finance a Fleet EV Charging Depot
- EV charging on a leased depot: who owns what?
- Why oversizing conduit up front cuts per-port cost
Duty cycles by fleet type
Procurement and delivery
- Electrician or EPC contractor for fleet charging?
- Warranty and service contracts on fleet chargers
- Commissioning a charging depot: the acceptance test
- How to design a fleet charging pilot that scales
- What should be in a fleet EV charging RFP?
- Which connector standard should a fleet depot use?
- Networked or standalone chargers for a depot?
Feasibility: routes, payload and duty cycle