City of Palo Alto Utilities (CPAU) and your EV charger

City of Palo Alto Utilities (CPAU) offers 1 EV program we have verified against its own published terms, listed below with the amount, the funding status and the date we checked.

Federal listing checked null

Verified programs

EV Charger Rebate Program for Multi-Family Properties75%of cost, up to $80,000
Open — limited funding
Who qualifies · 5 conditions
  • Multi-family property within CPAU's service territory (City of Palo Alto)
  • EV Charger(s) / EVSE, Level 2 or above, installed in shared or assigned parking
  • Part 1 application must be pre-approved by CPAU before purchase or installation
  • On-site pre- and post-installation inspections required
  • New-construction projects required by code to install EVSE are NOT eligible for the portion required by code
VerifiedLast checked 2026-08-31

Conditions are quoted from each program’s own published terms as we read them on the date shown. Meeting them is what makes an application eligible; it is not an approval, and a utility can apply requirements it does not publish.

Not in the federal directory

The Department of Energy’s Alternative Fuels Data Center does not carry a listing for City of Palo Alto Utilities (CPAU). That is a gap in the federal directory rather than a statement about this utility — what appears above was read directly from the utility’s own published material.

Where the federal credit went

There is no federal EV charger tax credit for equipment placed in service after June 30, 2026. Section 30C was terminated by section 70504 of Public Law 119-21. Any quote or article that nets a federal credit against your cost today is out of date — which is most of them.

Utility’s own page: https://www.paloalto.gov/Departments/Utilities/Electrification/Business-Electrification/EV-Chargers-for-Multi-Family-Properties


Price the install for your address

Whatever City of Palo Alto Utilities (CPAU) does or does not pay, the install cost is driven by your panel, the run and the permit. Model it in a couple of minutes.